  • Installing struts and secant piles in the Eastbound Reroute in Harold Interlocking.
  • Removal of concrete in preparation for the installation of secant piles for the Eastbound Reroute in Harold Interlocking.
  • Drilling secant piles to support a catenary foundation in Harold Interlocking. (CH058A, 11-02-2019)
  • Drilling holes into the secant piles of the Track A Approach Structure for dowel installation.  These dowels will accommodate the roof slab installation.  (CH061A, 3-03-2018)
  • Chipping secant piles in preparation of shotcrete installation at the Track A approach structure. (CH061A, 2-14-2018)
  • Waterproofing installation at the secant wall of the Track A approach structure which transitions trains from surface track to the tunnel below ground. (CH061A, 12-12-2017)
  • Chipping concrete at the base of a secant pile below the 39th Street Bridge. (CH061A, 11-27-2017)