Definitions

Sorry, no definitions found. Check out and contribute to the discussion of this word!

Etymologies

Sorry, no etymologies found.

Support

Help support Wordnik (and make this page ad-free) by adopting the word tpd.

Examples

  • In 2010, the Black Fox Mine is expected to produce 100,000 ounces of gold from operating the Black Fox Mill at approximately 2,000 tonnes per day ( "tpd") at an average gold grade of 4.3 grams per tonne ( "gpt") at a 95% recovery.

    The Earth Times Online Newspaper 2010

  • The Company is in the process of finalizing the purchase of a secondary crushing system capable of processing up to 7,000 tonnes per day ( "tpd").

    Marketwire - Breaking News Releases 2010

  • Initial production will be approximately 1,000 metric tonnes per day ( "tpd") and ramp up to 2,000 tpd in Year

    Latest News - Yahoo!7 News 2010

  • In 2010, the Black Fox Mine is expected to produce 100,000 ounces of gold from operating the Black Fox Mill at approximately 2,000 tonnes per day ( "tpd") at an average gold grade of 4.3 grams per tonne ( "gpt") at a 95% recovery.

    The Earth Times Online Newspaper 2010

  • The LAU replaces all existing environmental permits for the operations at Velardena and provides the necessary license for expansion of the current sulphide operations by adding a 1500 tonnes per day ( "tpd") mill as well as the continuation of all current operations.

    The Earth Times Online Newspaper 2010

  • The Company is in the process of finalizing the purchase of a secondary crushing system capable of processing up to 7,000 tonnes per day ( "tpd").

    Marketwire - Breaking News Releases 2010

  • The economic study considered a base case mining rate of 20,000 tonnes per day ( "tpd") mining

    Marketwire - Breaking News Releases 2009

  • During November 2009, the mill averaged throughput of approximately 7,600 tonnes per day ( "tpd") compared with a design rate 6,900 tpd.

    StreetInsider.com News Articles 2009

  • This study details the basis of ramp up in mill throughput to a nominal 4,100 tonnes per day ( "tpd") throughput and 91. 3% availability, resulting in 1.37 million tonnes per year processed in an optimised mill, with ore to be extracted from new mineralized areas discovered since 2006.

    The Earth Times Online Newspaper 2009

  • This operation is presently being expanded to 3500 tpd which is anticipated to be fully running at this new capacity by the second quarter of 2009 bringing annual production up to 3.5 million ounces of silver

    Safehaven 2009

Comments

Log in or sign up to get involved in the conversation. It's quick and easy.